Engineered installation and commissioning of filtration, RO, DAF and STP systems — delivered on site by Alnajdain.

Gallery

Commissioning — Filters

On-site commissioning of filtration skids and pressure vessels by our engineering team.

Filter commissioning on site
Booster pump and pressure tank commissioning
Self-cleaning disc filter commissioning
Triple housing filter installation
Aqua self-cleaning filter installed
Alnajdain field engineering team
Under-sink RO unit installation
Alnajdain technician installing under-sink RO system
Softener and filtration skid commissioning
Multi-stage softener and filter skids assembled
Gallery

Projects — RO

Reverse Osmosis plant installation and commissioning works.

RO membrane rack with high-pressure pump
Compact RO system with softener and control panel
RO plant control panel commissioning
Media filter vessels loading
RO panel and pre-treatment vessel
Compact RO and softener skid
Alnajdain RO commissioning team
Large-capacity RO skid installation
RO Plant 200 KGPD @ 5000 PPM with Grundfos high-pressure pump
RO plant commissioning at JANAX factory
Compact RO, softener and UV skid installation
Compact RO skid with softener, multi-stage filters and high-pressure pump
Gallery

Projects — DAF

Dissolved Air Flotation (DAF) units installed and commissioned for industrial wastewater treatment.

Alnajdain team commissioning EfloDAF unit
Corodex EfloDAF 7 m³/day at JANAX Factory
DAF unit commissioning on rooftop
Alnajdain technicians on DAF platform
Gallery

Projects — STP

Sewage Treatment Plant construction, installation and commissioning across Kuwait.

Sewage station on site
STP modular tanks
STP concrete chambers under construction
Manhole and chamber installation
STP container unit painted and prepared on site
STP control panel and blower skid
Softener and filtration vessel inside STP room
STP tank exterior with access ladder
Corodex MBBR STP 80 m³/day at KIPIC site
STP tank fabrication in workshop
Clear treated water sample from STP
Alnajdain engineers on site at KNPC fuel station